You pull the cord tight between two pins, step back and it looks straight. Then the middle of the brick course rises towards it, or a line level gives a different answer each time you touch the string. Builders line sag becomes part of the datum you follow. Shorten the span, use a light low-stretch line and keep weight off the cord.
In short
A builder's line always forms a shallow curve under its own weight, even when it looks taut. For a fence or level transfer, use one light vial near the midpoint and keep the span as short as practical. For brickwork, support a long run with a tingle resting on a brick whose height has already been checked from the leads. Over a long distance, fix the points with a laser or optical level and string only the shorter runs between them.
Sag is part of the reading
A suspended string forms a catenary. Tension flattens the curve, but gravity never removes it. If the centre sits 3 mm lower than the ends, a course or a mark set to that centre inherits the same error. A line can feel hard under your finger and still dip. Extra pull stretches the cord, flexes the anchors and lets wind push the longer span sideways. A pin, a profile or a stake can move under that extra pull.
BuildWiz describes about 4 metres as a practical unsupported limit for a brick line, shorter in wind or with polyethylene line. That is a rule of thumb. The same source mentions about 25 mm over 30 metres as a trade figure, which is why a long string is a poor substitute for survey equipment. Check the line from the side at roughly line height, then measure to a fixed point near each end and in the middle before you lay more bricks or bore post holes.
Choose the line and set the tension
Use building line, not soft household string. Thin braided nylon is widely sold as low-stretch, and that remains a product claim. A very fine line weighs less, yet it can cut gloves, slip in a knot and disappear against mortar or soil. Inspect the working length first. Mortar, knots and frayed fibres change how tension travels, and a damaged patch can break under a pull that felt safe yesterday. Replace a suspect length. A knot in the span is a weak point and can catch on a brick edge.
The supports have to hold the pull. Seat masonry pins in sound joints, set timber profiles firmly and brace fence stakes before you tension. Wind the cord so you can tighten it in small steps. Pull until a light pluck gives a crisp note, then stop and recheck both anchors. The sound is a workshop cue. Recheck after rain, a break or stronger wind, because moisture, temperature and settling stakes move the line. Keep a tight line off an access route: it is a trip and eye hazard, and a released pin can spring.
If you are buying the line and vial together, compare them in the string spirit level guide. The top pick is the Presch 2-piece line spirit level at about £11.99, with 4.3 from 704 amazon.co.uk reviews. It has counter hooks, a flat underside and a V-groove, and no cord in the box. One of the first 50 UK texts shows one bubble centred and the other off to the right, so compare the pair before you build to either. The listing says 8 cm by 3.5 cm and 10 g, with no millimetres-per-metre figure.
Set up a straight line step by step
For groundworks, fencing or a level transfer, mark the datum on both supports with a tape, water level or laser before you trust the string. The vial only reports the relationship between those supports through the cord. The sequence is in how to use a string spirit level.
- Fix two rigid supports and mark the datum. Divide a long run into shorter bays and transfer the checked height to each stake before you string it.
- Tie the line on the first mark, with a compact knot, and use wraps at the far end so you can tighten without cutting into the support.
- Tension gradually. If either stake leans in, brace it or shorten the span.
- Hang one vial near the midpoint, where the dip is greatest. Let it settle and read the bubble at eye level. Johnson Level warns that even a slight dip changes the reading.
- Move one end in small steps, wait for the cord to stop swinging, then tap each support and read again.
- Transfer the marks and take the vial off. Left on the line, it adds sag and bounces in the wind.
Turn the vial end for end if you doubt it. A sound vial should agree in both orientations. If a repeat reading only comes by pulling the anchors out of position, shorten the run, add checked supports or change the levelling method. Another vial will not straighten a span the supports cannot hold.
Support a brick line with a tingle
On brickwork the line sets both course height and the face. Build and check the corner leads for level, plumb and gauge, then stretch the line between matching courses. Pins or line blocks may hold a short run. On a longer run the centre can still drop towards the bed joint while both ends stay correct.
A tingle plate supports that middle. A typical Rhinobuild example is zinc-plated steel about 115 by 50 by 1.5 mm, around £4. It sits on a brick already laid to the correct height, and the projecting part carries the string. Check that midpoint brick from the leads first, then set the plate and lift the line onto it. Setting the plate from an unchecked vial only props up the original sag.
Keep the line close enough to guide the arris, and clear enough that mortar does not push it off the face. Move the tingle only onto another checked brick, and wipe mortar off the cord as you go. A folded strip of cement bag can stand in if it is firm, stable and thin. Damp paper, cardboard and odd timber change thickness under the line. The placement sequence is in the guide to a string spirit level for bricklaying. A tingle holds an unsupported span. It leaves bad leads, uneven bricks and a moved profile as they are.
Keep unnecessary weight off the line
Several vials on one string add point loads and pull the centre down. Use one light vial, transfer the mark and take it off. For bricklaying, set the leads with a suitable level and work to the bare line. Leave tapes, plumb bobs and clips off the cord. A tape laid on the string depresses it while you read. Bring a rule up to the line, and if the wind is moving it, wait or put up a safe windbreak.
A wet braid and dried mortar both change the line: water adds weight, and stiff mortar spots stop the tension running evenly. Wipe the cord and let it dry before you wind it. Setting the ends deliberately high is a poor correction, because the dip changes with span, wind and the line itself. Shorten the run, stay within what the supports can hold, or add a point you have already checked.
Know when string is not enough
String is immediate and visible for alignment. It is a weak sole height datum on a long site, for a precise drainage fall, or where movement would affect structure or waterproofing. Fix those marks with a laser, optical level or water level, then string the shorter working runs between them. The limits of a hanging vial are in when not to use a line level.
Check both planes. From above, a cord can look straight while it dips vertically. From the side, it can look level while it bows around an obstruction. Between supports it should touch only a deliberate tingle or a checked stake. Photograph and label important datum marks, and verify them before you restart. A line is easily knocked or retied overnight. Set the tolerance from the job: garden edging and a brick opening are different, and a trade rule of thumb is not the drawing.
Common questions
Why does a tight builder's line still dip?
How far can a builder's line run without a tingle?
Does polyethylene line sag more than nylon line?
Where should a line level hang?
Will several line levels pull the string down?
What is a tingle plate?
Can I improvise a brick-line tingle?
Is 25 mm of sag over 30 metres an accepted standard?

Peter F. is the editor for DIY & tools at productscompared.co.uk. Comparisons in this category are checked against amazon.co.uk listings, review evidence and public UK sources.
Related articles

String line fence posts UK: keep every post straight
Set the end posts first, then keep every intermediate post clear of a taut string.

When not to use a line level: choose the right tool
A centred bubble only shows that one short stretch of string is level at that moment.

Builders line care for nylon cord and vials
Fray, a dumping reel and a split bubble are separate faults on a nylon line and its vials.